48 Zone

Hydraulic Irrigation System

1000m³

Cut and Fill Laser Levelling

10,000m²

Soil Amelioration and turfing

Client Clarence Valley Council
Location Iluka | NSW
Value $0.55m
Timeline Dec 2019 - May 2020

Synergy were contracted by Clarence Valley Council to upgrade the Ken Leeson Oval. Site levels were verified using laser levelling to determine cut and fill. Soil amelioration and turfing was undertaken followed by design and construction of a hydraulic irrigation and pumping system.

The upgrade of the Ken Leeson Oval provides a safe and self-sufficient playing surface for several different sporting codes. Upkeep has been automated through a SCADA system to manage the pumphouse and irrigations system

Challenges for the works were encountered as the scope was reduced to the upgrade of the rectangular field while the design included the two cricket ovals on the outside. This meant that the design levels needed to be matched to the existing fields when installing the irrigation and turfing.

Additional works were added to the scope including the construction of a new synthetic cricket pitch and installation of a potable mainline feed to the feeder tank as a backup to the recycled water feed.

"Synergy were very professional to deal with. They went over and above in providing a quality product. They notified me in advance of any potential design issues and we got the issues sorted promptly and quickly."

Justin Menzies, Clarence Valley Council