CONTRACTUAL CRITERIA
BELOW DETECTION LIMITS
LITRES TREATED
Client | QUBE |
---|---|
Location | Moorebank | NSW |
Value | $2.0m |
---|---|
Timeline | Nov 2018 - Dec 2021 |
Synergy was elected to provide water management and treatment services to assist in managing PFAS contaminated surface and groundwater in the site catchment basins for the Moorebank Precinct works.
The Moorebank Precinct Intermodal Works is underway to construct one of the most important freight infrastructure projects being developed in Australia.
The precinct will be made up of a rail yard, trucking and warehouses which will allow shipping containers to be transferred between rail and road.
Previous assessment of the site identified historical Per and Poly-fluoroalkyl substances (PFAS) contamination within the surface water storage basins. Synergy were contracted to assist construction activities by treating the contaminated water within the storage basins to allow for capacity for rainfall events. The water treatment plant (WTP) consists of natural settlement tanks and filters where two different types of granular activated carbon (GAC) are used.