Venim Excavated
Select Fill Placed
Lining Systems Installed
Client | Tweed Shire Council |
---|---|
Location | Stotts Creek | NSW |
Value | $2.1m |
---|---|
Timeline | Jun 2021 - Oct 2022 |
Synergy was contracted by Tweed Shire Council to construct the new Stotts Creek Landfill Cell C. Excavation and construction have been undertaken utilising GPS Machine Control and works completed in full adherence with strict EPA guidelines for construction and management.
Synergy provided strategic input to lower costs, improve existing cell leachate management infrastructure, including automisation and ensuring that the landfill design was optimised to ensure infrastructure was protected for the life of the landfill. Synergy were also tasked with both the manufacture and installation of a fully automated leachate management system.