These sites were affected during the 2022 floods and resulted insections of asphalt becoming delaminated and overalldeterioration of the pavement as a whole. Synergy was taskedwith reviewing the designs and constructing these within thedetailed timeframes to the design provided. Due to the location of several sites accommodating sporting facilities and being located near popular beaches, Council had stipulated key dates for these Carparks to be completed within our program of works.